Studio Time

December 19, 2014 - 11:35 am

2014-12-19 09.47.58.jpg

That right there? It’s a panorama of my studio taken with my iPhone. That means it’s all warped, but you can at least see everything except the door and tool racks behind me. It’s still very much in process of becoming, but I’m starting to use it.

Today I made a pressing board! I started with an Ikea hollow-core table top, some batting, some fabric (which was also an Ikea deal) a staple gun, tack hammer and scissors. Quick montage below— there are lots of tutorials on the web for doing this sort of thing:

_MG_2579.jpg

_MG_2581.jpg

_MG_2582.jpg

_MG_2586.jpg

_MG_2593.jpg

_MG_2594.jpg

_MG_2596.jpg

I then promptly covered it in fabric: 

_MG_2603.jpg

That right there? Is my winter wardrobe. Or will be, soon. Hopefully at least a substantial fraction will be used before we leave for Texas. In a week. Nothing like a deadline for motivation!

For Want of a Nail

December 16, 2014 - 1:50 pm

The studio is coming together beautifully, but is very much mid-process. I’ve got “before” pics stored up and will post those along with the “afters” when I get it all together. Notably, three of the four bays in the garage have lights!! This is huge.

I had plans to continue working on the organization this morning, and started by putting things away. When I went to put my tack hammer on the pegboard the pegs fell off. So I opened the drawer containing all the tape, and the bottom fell out. The picture below is after I cleared everything out and popped the fiberboard drawer bottom back into the side slots. But the back rail and the bottom are too warped to get them to play nice again. 

_MG_2526.jpg

Yes, it’s another one of that sort of days. But never fear, I fixed it! 

I laid out the tools I thought I was going to use, and acquired a kitten helper:

_MG_2533.jpg

My basic premise was to attach eyebolts at the back center and front sides, put a strong zip-tie through the back center eyebolt, lace a cord from a front eyebolt through the zip-tie loop and attach it to the other front eyebolt, then tighten the zip-tie to tension the whole thing.

The cord would help support the drawer bottom directly, and any extra weight in the drawer would increase the tension pulling the back rail forward, helping the drawer bottom stay in its groove. Perfect!

I didn’t have eyebolts, only hooks, but pliers made short work of closing them up:

_MG_2540.jpg

I drilled a hole in the center back and used a screwdriver to help drive the eyebolt home:

_MG_2545.jpg

Drilled the holes in the front for the forward eyebolts:

_MG_2550.jpg

And then had a realization. The drawer won’t close if I have a bolt there. Derp.

Rethinking, I noticed Ikea had given me an attachment point you can see at the front of the drawer there, which was easy enough to lace a cord through:

_MG_2554.jpg

But they hadn’t given me a matching one on the other side for some reason. So I figured out I could create enough space with a putty knife to slip the cord under the rail entirely:

_MG_2555.jpg

But of course the drawer still wouldn’t close.  Grrrrr.

Not to be dissuaded I realized I could use my staple gun:

_MG_2560.jpg

and staple the cord down in a way that wouldn’t interfere with the drawer. Success!

_MG_2563.jpg

All that remained was to tighten the zip tie:

_MG_2559.jpg

Restore the drawer to its slot and refill it with stuff:

_MG_2575.jpg

And FINALLY tape up that pesky tack hammer that started it all:

_MG_2570.jpg

In the meantime I found the errant plumbers putty that has been delaying the repair of our leaky kitchen sink basin. No more!!

_MG_2572.jpg

Tune in later for the next installment of Adventures in Home Ownership!! 

Kenmore 158-540

November 17, 2014 - 2:32 pm

Today I’ve got so many things to talk about.

I’m excited about Curls and want to show off Jasper McTavish and the spinning I’m doing, but I haven’t gotten good pics yet, so I’ll settle for a teaser from The Artful Ewe, a favorite fiber store we visited this weekend:

_MG_2511.jpg

I finished up the Hex quilt top section, and cleaned up the living room. Again, here’s a teaser:

2014-11-17 09.06.48.jpg

I still need to figure out how to work this into a full or queen sized bed quilt.

I could talk about the tree we had taken out this morning, but I think that’s mostly just a story in pictures.

2014-11-17 09.49.34.jpg

2014-11-17 09.59.58.jpg

2014-11-17 10.14.13.jpg

2014-11-17 11.09.56.jpg

2014-11-17 11.19.18.jpg

So I’m going to talk about my Kenmore 158-540.

2014-11-17 08.52.43-1.jpg

I haven’t reworked this machine yet, nor named it, but it’s high on the list of machines to get fixed up. It came with all the gee-gaws:

2014-11-17 08.36.01.jpg

And I have it in a lovely cabinet (please ignore the tile stuff and the new toilet staged for the bathroom remodel):

2014-11-17 08.34.06.jpg

The cabinet has an inkwell:

2014-11-17 08.34.46.jpg

See, it fits here:

2014-11-17 08.34.33.jpg

And the next drawer down has spool pins and a pincushion:

2014-11-17 08.35.03.jpg

It also came with a knee lever, which I haven’t ever used:

2014-11-17 08.35.24.jpg

I haven’t cleaned it yet, but it was nearly spotless:

2014-11-17 08.41.12.jpg

2014-11-17 08.42.12.jpg

2014-11-17 08.53.14.jpg

It was missing its bobbin case and spool pins, but I found spares while I had it out. 

2014-11-17 08.58.33.jpg

2014-11-17 08.52.27.jpg

I love the lavender and purple bits.

2014-11-17 08.52.55.jpg

2014-11-17 08.53.01.jpg

2014-11-17 08.53.39.jpg

and its antennae:

2014-11-17 08.53.57.jpg

It’s biggest problem is the electrics. The plug was cracked. I glued it up:

2014-11-17 08.44.30.jpg

And then I found a replacement on ebay:

2014-11-17 08.44.43.jpg

The wiring looks ok, but I’ll give it a hard once-over when I’m putting it together:

2014-11-17 08.44.04.jpg

It’s a JA-4 casting:

2014-11-17 08.43.33.jpg

Or possibly a J-C16. It has both.

2014-11-17 08.43.43.jpg

And takes cams, of which I have a full set:

2014-11-17 08.35.55.jpg

But for now it’s put away in the cabinet, waiting for the studio to be put together:

2014-11-17 08.54.24.jpg

Change of Seasons

November 13, 2014 - 12:25 pm

So much to talk about I scarcely know where to begin.

Adventures in Home Ownership is approaching the wrap-up of the first big push. Since mid-March I’ve woken up every morning with a list of things I needed to accomplish for the house, and I’m starting to see the bottom of it creeping up. There are still a very large number of things I’d *like* to do, in an abstract “wouldn’t it be nice if…” sort of way, but the “must be completed for house to function” list is decidedly short. Just a few more small but fussy tasks in the downstairs bathroom, some work in the studio, and a couple contractor days. It’s good that the end is in sight because I’ve lost all enthusiasm for the work. 

We got a new kitten, Calcifer:

snoring kitten

He’s named after a character from Howl’s Moving Castle, which is one of our household’s favorite movies. The obligate cute kitten photos will commence:

2014-10-20 09.57.10.jpg

2014-10-22 19.19.25.jpg

2014-11-10 12.02.16.jpg

And also ob-video:

So, uhm, that’s been a distraction. We were hoping Mickey would like having a kitten friend. He was unconsolable after Pook died; I didn’t sleep for several weeks because he was so needy. Unfortunately, so far he’s terrified. He’s about 14 lbs. The kitten is not yet 2. Silliness.

I’ve been working on a quilt:

2014-11-06 11.19.40.jpg

It has taken over the living room:

2014-11-13 08.32.12.jpg

2014-11-13 08.32.54.jpg

I’m not allowing myself to play with my newest toy until it’s put away, and I’m not willing to put it away until the top is pieced since arranging all the hexes the way I wanted was a bit of a nightmare. But I have a beautiful new custom made wheel from Tom Livernois waiting for me, tucked in between the cutting table and the ironing board where it’s safe:

2014-11-13 08.34.15.jpg

I’m planning to spin yarn for a Curl. As soon as the quilt top is together. Because we really do need the gaming table, game shelf, and couches to be accessible. And I need a studio to work in so I stop doing this whenever I embark on a big new project. 

2014-11-13 10.23.56.jpg

three more rows to go!

Rolling Chair Mat

September 29, 2014 - 11:44 am

Today’s post will feature our quickie project from the weekend, because the tiling is on a timeout.

One of the little projects that has been malingering around here is making a rolling chair mat for David. Our carpets are super squishy, enough so the chair mats we had cracked immediately when we sat in our desk chairs.

I’m still suffering with carpet and making plans, but we purchased a box of laminate floor months ago for David’s mat, and it’s been buried in his closet. We excavated it last week when I was helping him get things bait more orderly, and it got put on the weekend task list.

The laminate strips are 48” long, which is a generous size for a floor mat. We decided to cut two down to the right size to fit between his desk legs so he wouldn’t roll off. 38” was the absolute widest, but to make it easier to fit we went with 36”. So first there was marking:

2014-09-28 12.36.50-2.jpg

I like making lots of marks:

2014-09-28 12.37.11-2.jpg

And then using a square to average them out:

2014-09-28 12.39.32-2.jpg

Note that I mark with sharpie. I do this because the kerf of my saw blade is about the same width as a wide tip sharpie. “Kerf” is the term for what gets turned into sawdust when you use a saw to cut something. There is a width to that cut, and it’s important to bear that in mind when measuring and marking to avoid sadness.

So here are the two boards that will become the extension of the mat. Notice also that I only marked one. I’ll be cutting them together, so as to be pretty certain of having them end up the same size:

2014-09-28 12.39.50-2.jpg

Next we set the saw up on a table in the driveway:

2014-09-28 12.45.51-2.jpg

Note the safety glasses, and the fact that I store the saw with the blade lock engaged. Also the saw is well clamped to the table, so it won’t start wandering from the vibrations when I start cutting. 

Plugged in the saw. I like tying the two cords in a knot where they join, so it’s harder to unplug them accidentally when walking around:

2014-09-28 12.45.46-2.jpg

Here’s my flustered assistant after I announced he would be doing the cutting: 

2014-09-28 12.45.53-2.jpg

When I put the flooring on the table I discovered it was just a little too wide for the saw to make it through in one cut: 

2014-09-28 12.47.33-2.jpg

You can kinda see that the boards are stacked, and they extend a little bit past the blade slot in the table. This means I shouldn’t really make that cut if I were following proper safety guidelines, and I wasn’t going to start David out on a chop saw by making a tricky cut. He got to support the long end of the boards, and make some practice cuts on pallet wood scraps instead.

I completed the cut by cutting as much as I could, then rotating the boards and cutting from the other side to complete the cut. Kids, don’t try this at home.

Next up was assembly. This laminate floor is click-lock, which means it doesn’t require glue when used as a floor. That’s excellent in normal situations because it means individual boards can be swapped out if they get damaged, but for our application we need it to hold together when squished by a task chair wheel into a thick carpet. That means we needed to glue.

So we laid out boards:

2014-09-28 12.54.08-2.jpg

Ran a line of glue down the joint:

2014-09-28 12.54.29-2.jpg

 

and clicked them together by inserting the top board at an angle:

2014-09-28 12.55.25-2.jpg

And then flattening them out:

2014-09-28 12.55.32-2.jpg

Not too much glue, because it can keep the joint from closing all the way. There is too much on the edge here:

2014-09-28 12.54.42-2.jpg

and that leads to glue forcing its way out through the seams, and the boards not fitting properly: 

2014-09-28 12.55.37-2.jpg

We wiped off the excess glue on top, then pulled the boards apart and wiped some of the glue out of the joint, and then they went together nicely. In an ideal situation there would be exactly enough glue to fill the spaces in the joint but not enough to overflow. In practice, with manufactured flooring, less tends to be more. The surfaces are going to fit together pretty tightly such that the glue will make a good bond. Too much actually makes the joint weaker, and creates a noticeable gap between boards.

Having a sponge, clean water, and a towel around is essential. There will be glue going where you don’t want it.

Last up was attaching the chair lip:

2014-09-28 13.08.21-2.jpg

We used the tape measurement to get it pretty much centered on the boards. Note that this particular floor allowed us to install boards cross-wise to each other. I decided this might further reinforce the joins between the long boards, so that’s what we did. 

Then we waited. It started curing on the porch for about 8 hours:

2014-09-28 13.14.16-2.jpg

then was moved gently into place to finish curing overnight. I apologize in advance for the poor lighting and messy state of D’s office, but here’s the mat doing its job: 

_MG_2462.jpg

David’s happy with it, and it seems completely solid. It’s more attractive than those plastic mats, and *much* less expensive. I believe the box of laminate was about $25. 

I may pull it out and use my laminate trimmer to round off the edges and remove the joint lips. Then again, it seems fine as is, so I may not. I’m pretty confident this will hold up to the job we’re asking it to perform until we decide to afford to replace the carpets with hardwood or laminate.

* * *

For them what wants to know what the tile did wrong, here is the update: 

I was 4 tiles away from done with the project when I broke one. For which there was no spare. I purchases two spares originally, and these are 12×24” tiles so that should have been plenty, but our layout for this room had to make several rearrangements due to Surprise! issues that came up during the construction, so I had ended up with no spare tiles.

Actually, I was about 6 tiles short of what I wanted, but I rearranged the layout to use the leftover travertine mosaic tile from the upstairs bath in a way that would cover the bathroom nicely. And for a bonus I got away from fussy cuts around the plumbing fixtures.

I’ve spent the whole project terrified of breaking a tile. I made sure they were handled carefully, only put down on a mat or on cardboard, and generally sweated from the time a tile was pulled from the box until it was on the wall. Then, during the install, I tapped one with a rubber mallet to help settle it into the mortar level with its neighbors, and it fractured into 8 triangular pieces radiating from the center. 

I spent at least a minute just staring at it and thinking furiously about what to do before I could bring myself to pull the broken pieces off the wall and scrape off the mortar.

When I pulled it away I discovered that there was a joint in the hardibacker that wasn’t level, and where I hit the tile was over the piece that was deeper. The lip between the boards was apparently enough, in combination with the tap from the mallet, to break this tile.

While I was scraping and cleaning up and trying not to cry I came up with a strategy. Plan A was to call the supplier and see if possibly maybe they had more of this tile we had purchased on super markdown closeout. Plan B was to extend the travertine mosaic tiles to cover more of the wall behind the tub. 

I just got off the phone with the supplier and she has one more box she’s holding for me, so phew. I don’t have to make a drastic rearrangement of my thinking. Also, meh. I am so tired of big tiles. But only about four more pieces to attach to the wall, and DONE. I like done. Well, done with the wall. Still have to make the slate vanity counter and the slate window sill and half wall ledge. Anyway. Much progress was made.

Tile will be done soon. Possibly tomorrow, if I can get the layout done today and the grout tomorrow. Then contractors come back. Then it’s a bathroom, and the planned construction on the house is officially complete. 

I call the first bath in the new tub— I’ve earned it!!!

Tile is Hard!

September 26, 2014 - 9:07 am

I had hoped to be done with the bathroom tiling but, well, I ended up going on two Epic Quests this week to hardware stores to find (1) the specific mortar I’ve been using and (2) the QEP tile leveling system I need to install the large tiles. Each required checking multiple hardware stores, and the mortar ended up requiring a will-call trip to the local distributor.

Each store, of course, had to re-check the shelf when I reported they were out of stock before they checked their computer to determine that Yep! That’s out of stock! Grr. Anyway. Hours were spent, things were found, tiling continued.

Monday I posted this picture:

2014-09-22 13.15.55.jpg

I snapped this at one of my breaks yesterday: 

2014-09-25 18.49.39.jpg

And here’s the state of the wall at the moment:

2014-09-25 22.09.02.jpg

The wall tile and the travertine mosaic blend more pleasantly in person than in my crappy cell phone camera’s eye. When it’s all done I’ll take out the good camera. The Monday photo above (which was taken in daylight) has a much closer representation of the colors.

The tools and materials are all on top of the tub: 

2014-09-25 18.50.17.jpg

which is what needs tiling next. That will be my job on Sunday. Then (hopefully) grouting on Monday, and we can call the contractors back to finish up!

I found some nice dark grey slate with a rough surface finish that will complement the pebbles in the floor tile. That will be the window sill, the ledge of the wall, and the counter under the vessel sink. I made some test cuts yesterday, and after adjusting the wet saw a bit it was quite happy to cut through them. I ripped the narrow strips that will be placed under the tile where it overhangs whatever surface it’s on. This will all make more sense with photos. 

I’m learning a lot about laying tile. Mostly, it HURTS. Kneeling for hours while wrestling with thick mud is surprisingly taxing. Or, perhaps not so surprising in retrospect, but I hadn’t anticipated the physical toll this work would take.

It’s also wet and messy. I was never the kid who wanted to play in the mud puddles. Ever. I liked building sand castles so long as I didn’t get too sandy myself. The answer to almost every issue in tiling seems to be add more water or add more mud.

I have gone through more sponges on this task than in every other task in my adult life combined. Caustic mud + porous foam = goo. I’ve taken to cutting the sponges in half or thirds, and I pretty much expect them to start disintegrating after one or two uses. And there are few things more tedious than picking disintegrating sponge bits out of rapidly setting grout. New sponges are your friend.

I am developing a fair proficiency at one of the former gaps in my DIY home owner knowledge, and have amassed a set of tools for doing this work. I’m pretty sure I can figure out most any tile layout I want to in the future, and will be much more savvy in assessing how hard a given task will be going in.

Tiling will be in the “Approach with caution” set of home tasks with tasks like cabinetry work and wall modifications, not the “never again” set that includes drywall and roof work, or the “I will never pay someone to do this” set that includes changing out light switches, painting, and minor plumbing repairs and upgrades. (There is also the “too much risk if I eff up” set of tasks that involves significant plumbing and electrical changes, and anything to do with gas.)

Soon, it will be done. One more tiling push, and then the grouting, et voila. I will take a bath in my giant new soaking tub and it will all have been worth it.

Adventures in Home Ownership!!

September 22, 2014 - 2:35 pm

So this post is a departure from the knitting I wrote about last week. I enjoyed daily blogging, but knitting isn’t really how I spend my time these days. Sadly, neither is sewing. I’m itching to get my studio going and dive in to all I want to do with Hack Your Clothes, but for the past 8 months I’ve been focussed on the house David and I bought back in Feb.

I’m almost done with all the originally planned improvements. So close. The last one on the initial list is the bathroom I’m tiling. I’m more than half way there:

2014-09-22 13.15.55.jpg

The floor is slate pebble tiles. The walls are big porcelain tiles edged with travertine mosaic. The decor will end up having a strong Asian flavor, leaning towards a Japanese garden sort of thing. There’s an antique hand carved and painted lacquer screen to hide the water heater, washer and dryer, and the heater. There’s a vessel sink which is glass with a pattern of koi in a pond. Paper lanterns for the light fixtures, and rice paper shutters for privacy screens on the window.

The contractors come back to finish out the plumbing and electrical stuff as soon as I get the tile on the wall; the floor is already done. But I ran out of mortar yesterday, so this morning I worked on a garden project.

A couple months ago I realized that when mud season starts we’re going to need some paths to be able to move around the house. The house is on quite a slope. We are at war with the blackberry, which was 25’ up into the trees and had grown up to the second story windows from the down slope I’m showing below. To keep it from re-emerging I’m going to be weeding on a hill all winter. I need at least someplace to stand. 🙂

So I started looking on the net, and got bitten by the “make it out of pallets!” bug. In the long run I want to hardscape with custom artisan concrete work. I am hatching plans for terraces and mosaics and very interesting retaining walls based on fabric formed concrete, but that’s a couple years from getting started and perhaps a decade from being realized. So I need temporary paths. Enter the pile of pallets.

2014-09-22 11.31.45.jpg

That’s the view towards the driveway when I roll up my studio door. There are paint cans and various other junk from the old owner that we are disposing of; we’re sort of down to the dregs of things that require special handling. After five dump truck loads of trash and eight of blackberry, ivy, and other overgrowth. But I digress.

The big stacks of wood are disassembled pallets. I picked them up off Craigslist, and in free moments of destructive energy I’ve been deconstructing them. There are 2×4’s:

2014-09-22 11.32.21.jpg

and 1×4’s:

2014-09-22 11.32.17.jpg

And a bucket of nails:

2014-09-22 11.32.13.jpg

The are going to be stairs here:

2014-09-22 11.32.51.jpg

Note that the railing was part of a daybed frame that was under the blackberry, and all the bricks and blocks were among the debris. This is a sort of “before” picture; I had tossed a few boards on the slope a couple weeks ago, and discovered stairs would be necessary.

I started laying them out today:

2014-09-22 13.29.19.jpg

Above shows some of the 2×4’s that will be step risers and the 1×4’s laid out in a test pattern, looking towards the back of the house. Here’s looking from the back to the front:

2014-09-22 13.18.33.jpg

Here’s another view of the future stair risers:

2014-09-22 13.16.21.jpg

And a look at the area under our porch that’s become tool storage as well as our dog run:

2014-09-22 13.19.04.jpg

That bamboo lattice is completely transparent to poodles, but the Belgian respects it. Up soon on the task list is improving the run fencing:

2014-09-22 13.19.12.jpg

She goes straight under the mesh along our property boundary, and walks through the lattice like it isn’t even there, so she only gets to go out and do her business with a leash. I’m going to get 6’ deer fence and drape the lower two feet on the ground to discourage tunneling.

The path will get set first, though. I need to level along the house and sink the boards in a bit, then mulch and plant between them. The steps need to be built. And there are a couple other yard tasks in the works in the next couple weeks. 

Anyway. I’ve been not posting because I figured this home improvement stuff is neither fiber nor food, but I’ve changed my mind. I’d like to have a record of the work I’m doing on the house and I like writing. So I’ll be doing more of it, as the whim strikes. 🙂

Cheers!

 

%d bloggers like this: